From Engineering to Execution: Supporting Major Industrial Projects

EPC
Procurement

Instrumentation Reference List

ItemProject TitleProduct(s) SuppliedBrand
1Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanDisplacer Type Level TransmitterWika
2Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanCoriolis Mass Flow TransmitterKrohne
3Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanUltrasonic Flow TransmitterKrohne
4Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanVortex Flow TransmitterKrohne
5Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanMagnetic Level IndicatorKOBOLD
6Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanPressure GaugeWika
7Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanDifferential Pressure GaugeWika
8Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanTemprature GaugeWika
9Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanPressure TransmitterSiemens
10Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanDifferential Pressure TransmitterSiemens
11Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanTemprature TransmitterMetron
12Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanThermowellMetron
13Base Oil Unit (Group II & III) Project (HDT)- IsfahanSafety Relief ValveBroady
14Base Oil Unit (Group II & III) Project (HDT)- IsfahanOrifice PlateBird Precision
15Base Oil Unit (Group II & III) Project (HDT)- IsfahanPressure RegulatorBroady
16Base Oil Unit (Group II & III) Project (HDT)- IsfahanMagnetic Level IndicatorWika
17Base Oil Unit (Group II & III) Project (HDT)- IsfahanDisplacer Type Level TransmitterDDTOP
18Base Oil Unit (Group II & III) Project (HDT)- IsfahanPressure TransmitterHoneywell
19Base Oil Unit (Group II & III) Project (HDT)- IsfahanDifferential Pressure TransmitterHoneywell
20Base Oil Unit (Group II & III) Project (HDT)- IsfahanTemprature TransmitterHoneywell
21Base Oil Unit (Group II & III) Project (HDT)- IsfahanPressure GaugeWika
22Base Oil Unit (Group II & III) Project (HDT)- IsfahanDifferential Pressure GaugeWika
23Base Oil Unit (Group II & III) Project (HDT)- IsfahanTemprature GaugeWika
24Base Oil Unit (Group II & III) Project (HDT)- IsfahanControl ValveFlowtop & Mark One
25Base Oil Unit (Group II & III) Project (HDT)- IsfahanVortex FlowmeterEndress+Hauser
26Base Oil Unit (Group II & III) Project (HDT)- IsfahanCoriolis Mass FlowmeterEndress+Hauser
27Base Oil Unit (Group II & III) Project (HDT)- IsfahanRadar Level TransmitterHoneywell
28Base Oil Unit (Group II & III) Project (HDT)- IsfahanCorrosion ElementCosasco
29Base Oil Unit (Group II & III) Project (HDT)- IsfahanRotameterKrohne
30Engineering, procurement and construction (EPC-1) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationSafety and Pressure Relief ValveBroady
31Engineering, procurement and construction (EPC-1) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationWellpads Control PanelProserv/ SMS (Alderley)/ Petro Controls
32Engineering, procurement and construction (EPC-1) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationPig ValvesSHANGHAI KOKO VALVE GROUP CO.,LTD.
33Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationSafety and Pressure Relief ValveBroady
34Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationFlow TransmitterHoneywell
35Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationLevel TransmitterHoneywell
36Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationPressure TransmitterHoneywell
37Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationPressure GaugeWika
38Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationPressure Gauge With Diaphragm SealWika
39Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationMechanical Pig IndicatorSHENYANG EMT PIPING TECHNOLOGY CO.,LTD.
40Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationBimetal ThermometerWika
41Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationMagnetic Level Gauge-
42Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationDisplacer Level TransmitterDDTOP
43Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationMeasuring Orifice PlateDDTOP
44Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationLine Break ValveOilway
45Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationLevel Control Valve-
46Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationPressure Control Valve-
47Engineering, procurement and construction (EPC-2) for Phase 1, including: Infield oil pipeline from Marun-3 to Marun-4; Marun-3 and Marun-4 modificationControl Valves Replacement M3 And M4Emerson Process Management (Tianjin) Valve Co., Ltd.
48Abadan new pump stations and terminals complex and Mile 40 pump stationControl Valve-
49Abadan new pump stations and terminals complex and Mile 40 pump stationLevel Switch-
50Abadan new pump stations and terminals complex and Mile 40 pump stationLevel Gauge-
51Abadan new pump stations and terminals complex and Mile 40 pump stationLevel Transmitter-
52Abadan new pump stations and terminals complex and Mile 40 pump stationPressure Transmitter-
53Abadan new pump stations and terminals complex and Mile 40 pump stationDifferential Pressure Transmitter-
54Abadan new pump stations and terminals complex and Mile 40 pump stationTemprature Element-
55Abadan new pump stations and terminals complex and Mile 40 pump stationTemprature Transmitter-
56Development and Production Operations Service Contract for Sohrab Oil Field Pipeline Expediting Package ProjectLine Break ValveZIGAO VALVE
57Khuzestan Steel CompanyPhotovoltaic Solar System-
58Khuzestan Steel CompanySkid mounted high integrity pressure protection system-
1Hengam Petrochemical RepairControl ValvesPARCOL
2Hengam Petrochemical RepairPositionerFlowserve
3Hengam Petrochemical RepairSafety ValvePietro Fiorentini
4Mobin Petrochemical RepairValveCoyard
5Mobin Petrochemical RepairFlowmeterKrohne
6Mobin Petrochemical RepairAnalyzerMichell
7Mobin Petrochemical RepairInstrumentation Hook upSwagelok
8Jam Petrochemical RepairControl ValveMetso
9Mobin Petrochemical RepairLevel GuageKrohne
10Jam Petrochemical RepairSafety ValveBroady
11Mobin Petrochemical RepairSafety ValveBroady
12Kermanshah PetrochemicalFlow TransmiterE+H
13Marun PetrochemicalInstrumentation Hook upSwagelok
14Salman Farsi Petrochemical CompanyUltrasonic FloemeterKrohne
15Marun PetrochemicalSafety ValveBroady
16Sadaf PetrochemicalLocal indicatorE+H
17Foolad Kaveh Steel Co.Temperature TransmitterE+H
18Foolad Kaveh Steel Co.Vortex FlowmeterE+H
19Foolad Kaveh Steel Co.Flow SwitchE+H
20Mobin Petrochemical RepairUltrasonic FloemeterKrohne
21Mobin Petrochemical RepairPROXIMITY SWITCHESGO
22Mobin Petrochemical RepairLIMIT SWITCHESHONEYWELL
23Mobin Petrochemical RepairFIRE & GAS DETECTORS, BEACON & SOUNDERMEDC
24Mobin Petrochemical RepairCOMPACT LOW DIFFERENTIAL PRESSURE SWITCHESDWYER
27Mobin Petrochemical RepairPRESSURE SWITCHESATOS
28Mobin Petrochemical RepairMAGNETIC PROXIMITY SENSOR (SWITCH )BERNSTEIN
29Mobin Petrochemical RepairDIFFERENTIAL PRESSURE TRANSMITTERSDWYER
30Mobin Petrochemical RepairPILOT OPERATED FUEL NOZZLE PURGE VALVEHALE HAMILTON
32Mobin Petrochemical RepairDIFFERENTIAL PRESSURE SWITCHESITT
35Mobin Petrochemical RepairFILTER MINDER PISTON-TYPE DIFFERENTIAL PRESSUREMID-WEST
36Mobin Petrochemical RepairFLAME DETECTORREUTER-STOKES
38Mobin Petrochemical RepairFIRE AND GAS DETECTION SYSTEMSIEGER

Fitting Reference List

ItemProject TitleProduct(s) SuppliedBrand
1Shadegan Oil Field ProjectInsert JonitFeiting (Wuxi Beilai)

Piping Reference List

ItemProject TitleProduct(s) SuppliedBrand
1Abadan Refiner Upgrading Project (Phase 2)Seamless PipingTianjin Pipe Co (TPCO)
2Abadan Refinery Upgrading Project (Phase 2)Welded PipingZhangjianga Kingland Pipeline Co
3Abadan Refinery Upgrading Project (Phase 2)Flange and BlankHEBEI SHANGHENG PIPELINE MANUFACTURING CO.,LTD/ Roc- Master Kunshan
4FPF HDPE ProjectPipingBao Steel
5Shadegan Oil Field ProjectLine Pipe fromWuxi Beilai
6Shiraz Refinery ProjectPipingPM Piping Germany
7SGL SMO ProjectPipingElite Piping

Static Equipment Reference List

ItemProject TitleProduct(s) SuppliedBrand
1Abadan Refinery Upgrading Project (ARUP Phase 2-2)Heavy Drums And Drum InternalsJingsu Thorp Energy Technology
2Abadan Refinery Upgrading Project (ARUP Phase 2-2)Reactors PackageJingsu Thorp Energy Technology
3Abadan Refinery Upgrading Project (ARUP Phase 2-2)DOUBLE PIPE/HAIR PINJingsu Thorp Energy Technology
4Abadan Refinery Upgrading Project (ARUP Phase 2-2)Columns And Comun InternalsJingsu Thorp Energy Technology
5Abadan Refinery Upgrading Project (ARUP Phase 2-2)NHT Fried HeatersJingsu Thorp Energy Technology
6Abadan Refinery Upgrading Project (ARUP Phase 2-2)Fried Heaters PackageJingsu Thorp Energy Technology
7Abadan Refinery Upgrading Project (ARUP Phase 2-2)Critical Drums and Drum Internals (Steam Disengaging Drum)Jingsu Thorp Energy Technology
8Abadan Refinery Upgrading Project (ARUP Phase 2-2)Critical Welded Plated Heat ExchangerAlfa Laval Packinox/ Lanshi Heat Exchange Company

Rotary Equipment Reference List

ItemProject TitleProduct(s) SuppliedBrand
1Abadan new pump stations and terminals complex and Mile 40 pump stationSurface Water PumpDalian Deep Blue Pump Co.,LTD
2Abadan Refinery Upgrading Project (ARUP PH 2-2)Centrifugal Pumps Gas Oil Hydrotreater UnitsDalian Deep Blue Pump Co.,LTD
3Abadan Refinery Upgrading Project (ARUP PH 2-2)Centrifugal Pumps Continous Catalytic Reforming UnitDalian Deep Blue Pump Co.,LTD
4Abadan Refinery Upgrading Project (ARUP PH 2-2)Centrifugal Pumps Naphtha Hydrotreating UnitDalian Deep Blue Pump Co.,LTD
5Abadan Refinery Upgrading Project (ARUP PH 2-2)Centrifugal Vertical Suspended Pump with related Etectro MotorDalian Deep Blue Pump Co.,LTD
6Abadan Refinery Upgrading Project (ARUP)Centrifugal Pumps Natural Gas and Fuel SystemShandong Emmecom Pumps CO.,LTD
Abadan Refinery Upgrading Project (ARUP)Non-essential Process Centrifugal Pumps Tankage AreaDalian Deep Blue Pump Co.,LTD
6Esfahan Oil refinery Upgrading & PetrochemicalCanned PumpsHayward Tyler/ Teikoku/ Yuemax
7Esfahan Oil refinery Upgrading & PetrochemicalHigh Speed Centrifugal PumpsWikow Pump
8Distillate Hydrotreating Project, Shiraz Oil RefineryCharge PumpsDalian Deep Blue Pump Co.,LTD
9Treated Distillate Aromatic Extraction Project (TDAE)- IsfahanCentrifugal PumpsDalian Deep Blue Pump Co.,LTD
10Base Oil Unit (Group II & III) Project (HDT)- IsfahanCentrifugal PumpsDalian Deep Blue Pump Co.,LTD
11Kermanshah Refinery Fuel Oil Upgrading, Vacuum Distillation, and Treatment of Fuel Oil and Gas Oil ProjectProgressive Cavity Pump for VDUWeifang Subtor Rotating Precision Machinery Co., Ltd.
12Kermanshah Refinery Fuel Oil Upgrading, Vacuum Distillation, and Treatment of Fuel Oil and Gas Oil ProjectPositive Displacement Reciprocating Pumps for CVUDamapu
13BANDAR ABBAS GAS CONDENSATE REFINERY PROJECTFeed Water PumpHEFEI HUASHENG PUMPS & VALVES CO., LTD./SHANDONG EMMECOM PUMPS CO.,LTD
14BANDAR ABBAS GAS CONDENSATE REFINERY PROJECTDegassed Sulphur PumpsDalian Deep Blue Pump Co.,LTD